← Back

Paths and drives that tie the whole plan together and stand the test of time, in paver, stamped concrete or flagstone. Quoted at the property, with grading and base preparation in the plan.

S-curved paver walkway with a charcoal soldier border
  1. Paver, stamped concrete, flagstone
  2. Grading and base preparation
  3. Ties into patio and lighting plans
  4. NC 811 before any excavation
  5. One crew, start to finish

The route between everything you built.

Multi-tone paver patio with a charcoal border along the back of the house

Paver walkways

The route to the door in cobble or modern pavers, laid to hold their line.

  • Grading and base preparation
  • Ties into the patio plan
Call or text
Two-level stamped concrete patio below a deck with cable railing

Stamped concrete

Poured and stamped in one continuous run, patterned to match the hardscape.

  • Patterns to match the hardscape
  • Quoted at the property
Call or text
Flagstone patio set in pebble joints around a stone fire pit ring

Flagstone & natural stone

Irregular stone set for the softer, garden-path look.

  • Full and irregular flagstone
  • Quoted at the property
Call or text
Freshly poured concrete driveway with a block edge along the lawn

Driveways

The first thing anyone sees of the place, built on a base made to take a car.

  • Grading and base preparation
  • NC 811 before any excavation
Call or text

From the drive to the door.

Cobble-style paver walkway to the front porchClassic brick patio and walkway bordered in bluestone with fresh mulch beds

Before you call.

What does a walkway cost?

Walkways and driveways vary too much by length, slope and material for a flat price, so they are quoted at the property. The written quote itemises everything.

Which materials can you use?

Pavers, stamped concrete and flagstone. On a walkthrough we look at the house, the existing hardscape and the grade, and quote the options that fit.

Who marks the utilities before digging?

We do. Your project coordinator files with NC 811 so every buried line is marked before excavation starts.

Walk the route with us.

A 30-minute walkthrough, then a written, itemised quote within five calendar days. The number you approve is the number you pay.