Structural walls
Segmental or natural stone holding back real grade, with gravel backfill and a drain line behind the wall as standard.
- Segmental and natural stone
- Drainage behind the wall, standard
Walls that hold their line for decades, with the drainage behind them treated as part of the wall. Written and itemised before we start.
Segmental or natural stone holding back real grade, with gravel backfill and a drain line behind the wall as standard.
Low walls that raise and edge the beds, set to follow the grade so the line reads clean from the street.

Walls are quoted at the property. Height, length, material and what is behind the wall all move the number, so we look at the slope first and put a written, itemised quote in your hands within five calendar days.
A wall fails from the water behind it, not the weight in front of it. Drainage behind the wall is part of every build, standard, not an add-on.
Homeowners file their own HOA submittals, and we make that easy: your written quote already contains the dimensions, photos and material specs most architectural review boards ask for.
A 30-minute walkthrough, then a written, itemised quote within five calendar days. The number you approve is the number you pay.